Why is the City of Fort Worth conducting this project?

The City of Fort Worth is conducting this project to improve mobility, foster economic opportunities, and enhance safety for residents, the traveling public, freight haulers, and pedestrians utilizing W Everman Parkway. This project aims to provide additional connectivity between Chisholm Trail Parkway and I-35.

What is the estimated overall timeline for the project?

The project kicked off in May 2024 with the design and pre-construction phase. Two community open houses have been held, one in June 2024 and one in March 2025. The design and pre-construction phase is anticipated to be completed in summer 2025. Construction is planned to begin in summer 2025 and is expected to be completed by summer 2027. This schedule is subject to change.

How will this project accommodate bicyclists and pedestrians?

This project will include continuous 10-foot-wide sidewalks on each side of the travel lanes to ensure safe and convenient access for all users. Additionally, the project will incorporate crosswalks, pedestrian signals, and other safety features at key intersections to enhance the overall safety and usability for both bicyclists and pedestrians.

How is this project being funded?

The design and construction of the Everman Parkway Extension project includes funding from the 2021 Tarrant County bond program and funds from the City of Fort Worth.

How will I be kept informed about the progress of the project? Who should I contact if I have questions or concerns?

You can sign up to receive construction notifications and other project updates on the project website. If you have any questions or concerns, the project team can be contacted via the project website, email, project hotline or by mail at:
Project website: www.evermanextension.com  
Email: info@evermanextension.com  
Project hotline: 682-207-7534 
Mail: Burns & McDonnell
Attn: Everman Parkway Ext Project Team
13737 Noel Road, Suite 700, Dallas, TX 75240

Will access to homes and businesses be affected during construction?

During construction, access to homes and businesses may be temporarily affected due to lane closures, restricted entry points, or short-term blockages. While some delays or detours may be necessary, we are committed to minimizing impacts to the extent possible.

Our construction team will provide notifications in advance of any planned road closures or significant access restrictions. Additionally, visible signage and detour route maps will be provided to guide residents, business owners, and other road users through the area. If you have specific concerns about access to your home or business during construction, we encourage you to reach out to the project team via email or the project hotline.

What does the city plan to construct?

The project extends Everman Parkway from Rosedale Springs Lane to Cameron Hill Point. The proposed design for construction includes two lanes in each direction, continuous 10-foot sidewalks, a roundabout intersection at the future Hemphill Street extension and a crossing of Sycamore Creek. Additionally, proposed improvements include a bridge over the Union Pacific Railroad (UPRR). 

When does construction begin? When is it expected to be completed?

Construction is anticipated to begin summer 2025, following preconstruction activities in spring 2025, which will include clearing the project site of vegetation (i.e. trees, shrubs, brush, and grass) and removing debris. Construction is expected to be completed by summer 2027. The timeline is an estimate and may be subject to change.

How noisy will construction be, and during what hours?

Construction will involve the operation of machinery and vehicles, which may generate significant noise. To minimize disruptions, much of the construction work will take place during daytime hours between 7 a.m. and 5 p.m. However, alternate work hours or night work may be utilized when necessary to accelerate project completion. The project team will notify the public in advance if night work is required.

What measures will be taken to control dust?

To minimize the impact of airborne dust and soil particles, the project team will water down exposed soil and dusty areas within the construction zone in an effort to suppress dust and prevent it from becoming airborne. 

Will utilities be disrupted during construction?

Utility service disconnection is not anticipated during construction. To maintain service, a bypass method will be used during sewer and sanitary line relocations. The project team will immediately notify the public in the event of a service disruption. 

What happens if I encounter an issue during construction? 

If you encounter an issue during construction, follow these steps to notify the project team:

1. Identify the issue – Determine the nature of the problem, such as safety hazards or access issues. If it’s an emergency, call 911.

2. Report it immediately – Contact the project team as soon as possible using one of the two options listed below.Call the project hotline and leave a detailed message with your name and callback number at (682) 207-7534 and a member of the project team will return your call.

Please note that the project hotline is monitored constantly by the project team and issues will be addressed as soon as possible.Email the project team at info@evermanextension.com and include photos if applicable.